Please upgrade the applications in the following order:(Manual
upgradation) or Use Installer Application from Update 3 CD
Please ensure u have
take back up of all data base, MDB and Day end is over in all modules.After
that do up gradation in the following order
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEh5zoZFBZzR_xwxS-3S1mW6Tz05gg_3F_GrW-QeGH4GeIADmbQMOs79Axu2xABV0P8NnaYDmhkD4rowRUsdSrWQTVsh7tt9yc4hlbMWHWYKOCIfSCspVtGH_TYuhe_O1popOCGm289dzLVL/s320/checklist.jpg)
1.
eMO
2.
ePayment
3.
Point of Sale
4.
Despatch
5.
Sub Accounts
6.
Treasury
7.
Postman
8.
AccountsMIS
9.
R Net Communication
11.
Accounts
eMO
· Ensure that other emo related
applications viz., Point of Sale, Postman etc; are not running.
· Run emo.exl, eMOOffices.exl,
eMOPincodes.exl, eMOBulkPayee.exl, one by one, using Script Tool
with the new versions
provided
ePayment
· Stop ePayment application.
· Ensure that other ePayment related
applications are not running.
· Upgrade eCounter database by running
eCounter.exl and ECounterPOCodes.exl using script tool.
· Replace the existing ePaymentClient.exe
with the new ePaymentClient.exe in ePayment Client installation path.
Point of Sale and
Despatch
· Run the script Counter.exl and
Counte_1.exl using Script Tool.
· Run the script ECounter.exl using
Script Tool.
· Replace the existing PointOfSale.exe
with the new PointOfSale.exe in Point Of Sale
Client installation path.
· Replace the existing Despatch.exe with
the new Despatch.exe in the installation path.
· Copy the WNX.DLL to the Point Of Sale
Client installation path and register the DLL.
· Copy the ClientSoftware folder to the C
drive of each client system and share the folder.
· Copy the WNXMasterdata folder to the
server.
Sub Accounts
· Run the script SUBACCOUNTS.exl using
Script Tool.
· Replace the existing SubAccounts.exe
with the new SubAccounts.exe in SubAccounts Client installation path.
Treasury
· Run the scripts Treasury.exl,
Treasury.exl using Script Tool.
· Replace the existing Treasurer.exe with the new Treasurer.exe in Treasurer Client
installation path.
�� Postman
· Replace existing Postman.exe with new
one.
· Replace existing EMODelivery.dll with
new one.
· Replace existing EVPDelivery.dll with
new one.
· Register both EMODelivery.dll and
EVPDelivery.dll
· Run Postman.exl with script tool.
AccountsMIS Client (DET)
o Replace existing Meghdoot Accounts MIS
Client.exe with new one.
o Replace the ServerObject.dll and
AccountMISClient.dll with the new ones.
R Net Communication for
Post Offices
· Stop the R Net communication Client.
· Ensure that the Counter and Postman
database up‐gradation is over successfully.
· Take the backup of Old communication
Client.
· Replace the R Net communication exe
with the new one.
· Run the R Net communication exe.
· If any error is reported, please send
the mail to support@ceptmysore.net with error screen shot and Log, TXD and RXD
folders.
MO Compilation ( for
Head Post Offices only)
· Replace existing MOCompilation.exe with
new one.
· Run MOCompilation.exl with script tool.
· Login as MO Compilation Supervisor and
go to My Office �� Environment
menu option and provide all required details and click on ‘OK’ button to save
entries.
Accounts ( for Head Post
Offices only)
· Copy AccountsFix folder to Desktop.
· Run AccountsFix.exe available therein.
· Replace the existing Accounts.exe with
the new one
AccountsPBS ( for Head
Post Offices only)
o copy the new Schedule.exe and replace
the old exe with the new exe in the same location.
o Run the Schedule.exl with script tool.
No comments:
Post a Comment